Voltrus ChangeoverSign in

CO-01Machine changeover coordination

Mechanics, mold, QC and production arrive at the machine right when it is their turn.

A changeover needs many people who move between machines all day. Voltrus Changeover tells each of them which machine to go to and when, then tells them again the moment the plan moves: the step before finished early, ran late, or got blocked.

App for Android and iPhone. Supervisor console in the browser.

Live board: changeover timeline per machine with plan and latest projection
App: my jobs across machines

CO-02How it works

From a changeover standard to the machine running again

  1. Build a changeover template

    One template per kind of changeover: mold change, die change, format change. Each step has a craft (mechanic, mold, QC, production, project), a standard time, the steps that must finish first, and a SMED phase: internal (machine stopped) or external (machine still running).

  2. Schedule it on a machine

    Pick the machine, the template and the stop time. External prep is planned backwards so it is done before the stop; internal steps run forwards from it. Standard downtime comes from the critical path.

  3. Everyone gets told

    The assignee, or every member of the craft when nobody holds the step yet, gets the schedule on their phone, then a "go to INJ-07 in 10 min" reminder before their turn.

  4. The plan follows reality

    A step finishes early: the next person hears "ready now". A step runs late: the next person gets the new time and what it waits on. Nobody shows up: the supervisor hears about it.

  5. Machine runs, data stays

    Actual downtime, step times, blocks and waiting time are recorded as they happen, so you can see which steps to improve.

Template editor with step graph and critical path
Changeover detail: steps, crew and supervisor actions
Screenshots from the PT ABC sample plant with sample data.

CO-03Features

Notifications that follow the changeover as it runs

The server recalculates the schedule whenever a step starts, finishes or gets blocked, and every minute. Each notice goes out once, to the right people.

Heads-upa few minutes before their turn (per craft, for example 15 minutes for mold)
Ready nowthe step before is done, including how many minutes early
New timemoved 5 minutes or more, with the name of the step it waits on
Nobody startedready for 5 minutes and not started, to the supervisors and the craft
Over standarda step running well past its standard time
Prep not readyexternal prep projected to finish after the planned stop
Blockedcrane, tool, material, mold problem, waiting for QC, with who reported it
Check faileda checklist answer out of range or NG, with the value; checks that must pass hold the step
Doneactual downtime against standard

An app for the people on the floor

One "My jobs" list across machines, soonest first. Large buttons that work with gloves on.

  • Claim an open step, start, finish, mark it blocked, or undo within 10 minutes.
  • Starting an internal step records the machine stop.
  • A checklist per step: Yes/No, numbers with limits (temperature, weight, torque), OK/NG choices, notes. The step can only be finished once its checklist is complete.
  • Scan the QR code on a machine with the phone camera to open that machine's changeover.
  • The inbox keeps every notice; switch off duty when the shift ends.
App: changeover steps and status
App: today's changeover board

Live board and TV mode

A timeline per machine shows the plan and the latest projection, late and blocked steps, and a line for now. TV mode for a monitor on the shop floor.

TV mode for a shop-floor monitor

Crew plans without clashes

A per-person view shows who is at which machine and when. The console flags anyone booked on two machines at once, walking time between machines that is too tight, and crafts that need more people than are on duty.

Per-person crew plan with clashes flagged

Reports and analysis

A report per changeover (CSV, Excel and a printable page), downtime trend against standard, comparisons by machine and template, the steps that most often run over, block reasons, and waiting time per craft.

Analysis: downtime trend, steps that run over, block reasons
Changeover report with actual and standard downtime

An improvement board that measures the result

SMED ideas go on a kaizen board, linked to the template and step. Once an improvement is done, the real downtime saving is measured from the changeovers after it.

An AI assistant for SMED and scheduling

Runs on Cloudflare Workers AI with a Qwen model. The AI only suggests; a supervisor decides.

  • SMED ideas per template from your actual data, with the numbers behind them and a one-click template change.
  • Proposed stop times and crew assignments for a day, re-checked by the scheduler so nothing clashes.
  • Free questions over your changeover data.
Kaizen improvement board with measured savings

Connected to the ERP

Production orders from the ERP (API or CSV) become draft changeovers wherever the mold or product changes. The Epicor Kinetic connector pulls a BAQ on a schedule. Signed webhooks send the stop time, restart time and downtime back to the ERP.

ERP integration: API keys, webhooks, CSV import and Epicor

Also

  • In the cloud, or installed on a plant server (Docker or systemd) for plants with intranet only.
  • Sign in with plant code, employee code and PIN. Admin, supervisor and member roles.
  • Indonesian and English, light and dark themes.

Demo plant, PT ABC

Sign in to a sample workspace with 13 machines, 18 people and 6 weeks of history. Sample data, not a real customer.

Plant code
PTABCD
Employee code
ABC002
PIN
246810

Screenshots from the PT ABC sample plant with sample data.

CO-04Pricing

Per plant per month, unlimited people

A changeover involves many crafts, so we do not charge per person. 14-day free trial. Pay yearly and get 2 months free.

Starter

$49/month

Rp 790.000/month

  • Up to 10 machines
  • Android and iPhone app with notifications
  • Live board and templates
  • Reports, CSV and Excel
Start free trial

Enterprise

From

$399/month

Rp 6.390.000/month

  • Epicor Kinetic connector
  • Option to run on a plant server
  • Several plants
  • Onboarding and a support SLA
Contact us

Prices exclude VAT.

CO-05FAQ

How is this different from a schedule in a WhatsApp group?

A WhatsApp group does not know which step waits on which. Voltrus Changeover recalculates the schedule on every change and tells only the people affected, at the right moment. Every time is also recorded for analysis.

What if nobody is assigned to a step?

Every on-duty member of that craft is told. The first one to tap "Claim" holds the step, and the others stop getting notices for it.

Do phones need to be online all the time?

Notifications need internet. For plants with intranet only, the server can run inside the plant; notices still land in the app inbox.

Does it work for changeovers other than mold changes?

Yes. Templates are free-form: press die changes, packing format changes, colour changes, CNC setups and more.

Where is our data stored?

The cloud version stores data in Cloudflare D1 in the Asia Pacific region. The plant-server version keeps everything on your own server.

Is the app on Google Play and the App Store?

The Android and iPhone apps are being released to Google Play and the App Store. Until they are listed, contact us for a test build.

Start with one line

Create a workspace, copy the sample mold-change template, adjust its times, and schedule your next changeover. Questions? We answer on WhatsApp and email.